
Members Meeting Monday 9-30-24 starting at 7 pm.
18 Middle Lane, Harveys Lake, Pa 18618
Members Meeting Monday 9-30-24 starting at 7 pm.
The driveway work has been completed ahead of schedule and the Range is now open. A french drain was installed in gate area to carry water away from the driveway, the base was replaced in the stretch that develops potholes and the entire driveway was recrowned.
The Range is Closed today 9-3-24 & tomorrow 9-4-24. A contractor is rebuilding the driveway. Please check back here for timely updates.
Reconstruction of the driveway will begin Tuesday 9-3-24 and should be completed by Thursday 9-5-24. The contractor will be performing the following work: the flat area that continues to form potholes will be excavated, the subbase replaced, and a crown added. The gate area will be built up and sloped to one side so the water can run off the driveway. A French drain will be installed in the gate area to carry the rain runoff away. As a result of this work, the range will be closed Tuesday and Wednesday. Please check back her for timely updates.
Members Meeting Monday 8-26-24 starting at 7 pm.
Members Meeting Monday 7-29-24 starting at 7 pm.