Reconstruction of the driveway will begin Tuesday 9-3-24 and should be completed by Thursday 9-5-24. The contractor will be performing the following work: the flat area that continues to form potholes will be excavated, the subbase replaced, and a crown added. The gate area will be built up and sloped to one side so the water can run off the driveway. A French drain will be installed in the gate area to carry the rain runoff away. As a result of this work, the range will be closed Tuesday and Wednesday. Please check back her for timely updates.